You are here
Borouge starts turnaround at No. 3 cracker
Borouge has taken off-stream its No. 3 cracker for a maintenance turnaround. The company has undertaken a planned shutdown at its cracker on January 5, 2019. The cracker is likely to remain shut for a period of around 6-7 weeks. Located at Ruwais, Abu Dhabi in UAE, the No.3 cracker has a production capacity of 1.5 mta.
Date:
2019/01/17